Chris Sim's "Como" layout
18th November 2005

Photos of Chris Sim's HO layout based on the old Como bridge. I'm helping Chris build the layout and so far we have it running, including a working automatic gantlet track on the bridge, and it has reached the basic scenery stage. When its finished we intend to exhibit it...... if we can get it out of his flat.... ;-)

<-- Index | Showing 1-12 of 12 pictures | Index -->
4 car Eureka 620 class set rumbles onto the bridge
4 car Eureka 620 class set rumbles onto the bridge
702x550
051230_620c.jpg
2005-12-30 19:16:09
Down South Coast passenger made up of 2 x Eureka 620 sets runs into the platform area at Como.  The factory weathering on the early Tuscan version is absolutely magnificent!
Down South Coast passenger made up of 2 x Eureka 620 sets runs into the platform area at Como. The factory weathering on the early Tuscan version is absolutely magnificent!
733x550
051230_620b.jpg
2005-12-30 19:17:49
2 x Eureka 620 class about to cross the bridge
2 x Eureka 620 class about to cross the bridge
545x450
051230_620a.jpg
2005-12-30 19:16:55
Chris's 3229 hauls a Down South Coast passenger onto the bridge
Chris's 3229 hauls a Down South Coast passenger onto the bridge
689x521
041209_10.jpg
2004-12-09 11:59:55
3229 on a Down South Coast passenger crosses the bridge
3229 on a Down South Coast passenger crosses the bridge
600x385
040912_07.jpg
2004-12-09 11:58:06
December 04.  Big Power on the Coast!  Chris's 58 crosses the bridge on another Down goods.  I'm quite pleased with the water effect, achieved with the extremely traditional method of paint over a stippled plaster base, with a couple of coats of Gloss Medium on top for the
December 04. Big Power on the Coast! Chris's 58 crosses the bridge on another Down goods. I'm quite pleased with the water effect, achieved with the extremely traditional method of paint over a stippled plaster base, with a couple of coats of Gloss Medium on top for the "wet" look. Chris seems strangely reluctant to put the finishing touches to his model of the bridge.......
413x550
09120431.jpg
2004-12-09 12:16:15
In Dec 04 the scenery at the northern end of the bridge was substantially complete and a start had been made on the scenery on the southern bank.  One of Chris's 50 class comes off the bridge with the Up Milk.
In Dec 04 the scenery at the northern end of the bridge was substantially complete and a start had been made on the scenery on the southern bank. One of Chris's 50 class comes off the bridge with the Up Milk.
400x562
09120423.jpg
2004-12-09 12:09:44
Detail of the rock work and water near the northern end of the bridge.
Detail of the rock work and water near the northern end of the bridge.
600x450
09120406.jpg
2004-12-09 11:57:38
September 05 and work is progressing on the concrete platform extensions.  Construction is in styrene.  At the moment we are concentrating on completing the timber framework supporting the lighting.
September 05 and work is progressing on the concrete platform extensions. Construction is in styrene. At the moment we are concentrating on completing the timber framework supporting the lighting.
700x423
05090101.jpg
2005-09-01 14:22:17
August 05, and work is continuing on the Como platform area.  A double Standard hauled Down Illawarra freight comes off the bridge and begins the climb to Sutherland.  It must be a Sunday, as the Up passenger is hauled by my Trainorama 44!  One of the features Chris is working towards is running authentic Illawarra trains.
August 05, and work is continuing on the Como platform area. A double Standard hauled Down Illawarra freight comes off the bridge and begins the climb to Sutherland. It must be a Sunday, as the Up passenger is hauled by my Trainorama 44! One of the features Chris is working towards is running authentic Illawarra trains.
800x480
05082503.jpg
2005-08-25 13:29:28
In April 05 the northern end of the bridge was looking quite good.  Double Standard hauled Up goods waits in Como platform area for a SAR single ended 930 to exit the bridge on a Down goods.  We could pretend that the 930 is doing an acceptance trial, but unfortunately it is carrying the full red louvres livery that wasn't applied to 931 till many years after it was delivered......  Guess I'll just have to arrest myself over that one......  I built 931 in the late '80s and it is a heavily modified Lima body on an Athearn chassis.
In April 05 the northern end of the bridge was looking quite good. Double Standard hauled Up goods waits in Como platform area for a SAR single ended 930 to exit the bridge on a Down goods. We could pretend that the 930 is doing an acceptance trial, but unfortunately it is carrying the full red louvres livery that wasn't applied to 931 till many years after it was delivered...... Guess I'll just have to arrest myself over that one...... I built 931 in the late '80s and it is a heavily modified Lima body on an Athearn chassis.
590x500
05040719.jpg
2005-04-07 14:24:53
April 05, the cutting to the north of the bridge was complete, though there is a lot of flora to be added yet!  Chris's 55 and one of his 50 class start the climb to Hurstville with a typical up Illawarra freight.
April 05, the cutting to the north of the bridge was complete, though there is a lot of flora to be added yet! Chris's 55 and one of his 50 class start the climb to Hurstville with a typical up Illawarra freight.
753x639
05040711.jpg
2005-04-07 14:19:05